
Add to Cart
Biosound Mylab 40 Measurement Cannot Be Used Ultrasound Machine Repair Replace Mainboard
1. Repair time: 2-4 days
2. Warranty: 60 days
3. Fault phenomenon:Measurement Cannot Be Used
Various GE//Siemens/Toshiba/Hitachi/ Biosound ultrasonic boards are within our repair/ mintenance range.
Other ultrasound parts related that we can offer:
Brand | System | Description |
Biosound | Mylab 20 plus/30/40 | CPU mainboard 9501361000 |
Biosound | MyLab 25 | power board 9501083010 4271440192 |
Biosound | MyLab 25 | Doppler PCB board 8607300660 8607300670 |
Biosound | MyLab 40 | MyLab 40 hard disk |
Biosound | MyLab 50 | TRX board 9501212000 |
Biosound | MyLab 50 | 9501220000 |
Biosound | MyLab 50 | control panel User Interface 9102806000 |
Biosound | MyLab 50 | SPS Switch Power Supply 9501100000 |
Biosound | MyLab 50 | XVision mainboard 18008-0000-99-2 Rev 1.2 |
Biosound | MyLab 70 | ITR board 9501089000 |
Biosound | Mylab twice | ITR board 9501089020 |
Knowledge point
Common sence of the caolor ultrasound machine maintenance
1.Operating procedure for cleaning and maintenance
1) Turn on the power, check whether the startup and operation functions of the equipment are normal and whether there is any error message.
2) Record the name, model, hardware and software version of the device, and configuration of the probe.
3) Ask the user about the use of the equipment.
4) To turn it off.
2.Remove the peripheral parts of the equipment and disconnect all cables from the equipment
1) Pull out the power cord of b-mode ultrasound from the plug and cut off the power supply of the equipment.
2) Carefully remove the probe from the connector and place it in an appropriate place for storage.Preventing accidents such as dropping, collision and cable pulling
3) If b-ultrasound is equipped with external devices such as printer and video recorder, these devices should be disassembled and separated from the host.
4) Disconnect the signal line and control line,which connected with b-ultrasonic.Note the cable interface location for future recovery.
3.Remove the device
1) In order to achieve an effective dust removal effect, the equipment must be dismantled.
2) The location of the cable connector is very important. Although most equipment has a device to prevent wrong insertion, it is still important to remember that the connector being put correct.
3) Separate the shell, components, etc. of the equipment with appropriate tools and in a correct manner.These jobs do not require much effort under the right operating procedures.But improper disassembling methods and violent disassembling will lead to equipment damage.
4) The screws and other parts which being departed before must be carefully stored, in order being lost.
Precautions for Maintenance
Before delivery, we'd like to confirm the below details of your defective ultrasonic board.
Have your board ever repaired? ( Better to be never repaired)
Is the board original in complete condition?
What's the detailed faults? ( Send me fault description, fault image or video)
Your answers will help our repair engineers team to prejudge whether it's repairable.